Compare Farizon SV

  • Nothing matches that.

Farizon

SV

2026 67 kWh

67 kWh

£39,000

Includes the £5,000 Electric Car Grant. Before it, £44,000.

Full details →
  • Nothing matches that.
Battery SV 2026 67 kWh
Battery (kWh) 67
Range SV 2026 67 kWh
Range (miles) 188
Cost SV 2026 67 kWh
Cost of a full charge £5.36
Cost per mile (p) 2.9
Price £44,000
Dimensions SV 2026 67 kWh
Turning circle (metres) 12.2
Length (mm) 4,990
Width (mm) 1,980
Height (mm) 1,980
Weight (kg) 2,150
Volume (m³) 6.95
Payload (kg) 1,350
Ground clearance (cm) 15
Drag Coefficient (Cd) 0.29
Wheelbase (mm) 3,100
Details SV 2026 67 kWh
Seating (seats) 3
Charging SV 2026 67 kWh
Fastest charge time 36 mins
AC charge power (kW) 11
AC charge time 6h 30m
Performance SV 2026 67 kWh
Drive RWD
Motor (kW) 170
Horsepower (hp) 231
Torque (Nm) 336
Something wrong? Inaccuracies? Tell us here

Support the website by using our referral links