Compare AION V

  • Nothing matches that.

AION

V

2026 Standard

75 kWh

£36,450

No Electric Car Grant.

Full details →
  • Nothing matches that.
Battery V 2026 Standard
Battery (kWh) 75.3
Battery chemistry LFP
Range V 2026 Standard
Range (miles) 317
Efficiency (mi/kWh) 3.7
Cost V 2026 Standard
Cost of a full charge £6.02
Cost per mile (p) 2.2
Price £36,450
Performance V 2026 Standard
Drive FWD
Top speed (mph) 99
Acceleration (secs) 7.9
Motor (kW) 150
Horsepower (hp) 204
Torque (Nm) 210
Dimensions V 2026 Standard
Turning circle (metres) 11.2
Length (mm) 4,605
Width (mm) 1,854
Height (mm) 1,686
Weight (kg) 1,880
Boot volume (litres) 500
Ground clearance (cm) 16.6
Wheelbase (mm) 2,775
Details V 2026 Standard
Seating (seats) 5
Charging V 2026 Standard
Max fast charge power (kW) 180
Fastest charge time 24 mins
AC charge power (kW) 11
AC charge time 8h 30m
Heat pump Yes
Autocharge Yes
Warranty (years) 8
Tech V 2026 Standard
V2L (3-pin socket) Yes
Something wrong? Inaccuracies? Tell us here

Support the website by using our referral links